6,652 SQ. FT
618 SQ. M
(House Size)
Property located in the Las Mañanitas sector, Corregimiento de Tocumen. It has a proportional area of land and commercial warehouse of Phase No. 3, with a construction area of 618.00m2, Zoning: MP-C2. Lot of land with a registered area of 422.00m2. The logistics center has an underground electrical system, a drinking, sanitary and rainwater system, a surveillance camera system, a wastewater treatment plant and a fire protection network. It has a ground floor, including reception, two half baths, dressing area, dining room, galley area. Mezzanine Floor (Level 1): offices, server room, half bathroom and toilet room Mezzanine Floor (Level 2): circulation corridor, two meeting rooms, two offices, storage room and half bathroom